Wimbledon Platform 10 Abandonment Works
Network Rail
Client name:
Network Rail
Project duration:
6 Months
Project value:
£50k – £100k
Services provided:
Signalling Design and Design Management
Project Scope Overview
Ark were commissioned to provide all the necessary signalling designs and documentation to support the closure of Wimbledon Platform 10 to facilitate tram works
- Stage 1 signalling designs to support a temporary alteration to the signalling arrangements in order that the London end of Wimbledon Platform 10 could be decommissioned
- Stage 2a signalling designs to support the relocation of signalling equipment and cables from the Tramlink construction site area
- Stage 2 signalling designs to support the permanent way works required to enable the second Tramstop face to be constructed and final interlocking alterations to the signalling system
Interested? Get in touch
Want to learn more about our signalling design services? Looking to discuss a specific project? We’d love to hear from you.